Pulsant Edinburgh SC-3 (Newbridge)
Pulsant Edinburgh SC-3 (Newbridge) is an operational data center operated by Pulsant in Edinburgh, United Kingdom. Our footprint estimate of its power is about 1.9 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Pulsant |
| Facility power | 1.9 MW (range 1 MW to 3.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,615 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 810 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 2 networks PeeringDB. |
| Also known as | Edinburgh SC-3 |
| Address | 7 Claylands Road, Newbridge |
| Coordinates | 55.92939, -3.41002 |
| Website | pulsant.com |
Power and grid
| Nearest high-voltage substation | Broxburn 132kV Substation, 132 kV, 2.9 km away (SP Transmission) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Sighthilll Substation, 275 kV, 6.5 km away |
| HV substations within 10 km | 4 |
| Power plants within 50 km | 1.3 GW in 31 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 7.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 26.7 °C (2001 to 2025) |
| Cooling degree days | 1 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.45 kWh per m² per day |
| Wind at 50 m | 7.4 m/s average |
| Water stress today | Low (<10%) (Scotland) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Pulsant Edinburgh SC-3 (Newbridge) use?
We estimate the facility power at about 1.9 MW. Estimate from building footprint, low confidence.
How close is Pulsant Edinburgh SC-3 (Newbridge) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Broxburn 132kV Substation (132 kV), about 2.9 km away.
How clean is the power for Pulsant Edinburgh SC-3 (Newbridge)?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Pulsant Edinburgh SC-3 (Newbridge)?
Pulsant.
Data centers near Edinburgh
- Pulsant Edinburgh SC-2 (Medway) 7.1 km · 3.3 MW
- Pulsant Edinburgh SC-1 (South Gyle) 7.1 km
- Lloyds Banking data center in Colinton 7.2 km
- Pulsant Edinburgh SC-1 7.3 km · 1.4 MW
- Sungard Availability Services 7.4 km · 4.4 MW
- Data center in Colinton 9.9 km
- RBS Melville Gate Data Centre 20.5 km · 17 MW
- RBS Data Centre 31.7 km · 18 MW
More Pulsant data centers
- Pulsant Reading SE-3 (South) United Kingdom
- Pulsant data center in Milton Keynes United Kingdom
- Pulsant Croydon LN-1 United Kingdom
- Pulsant Edinburgh SC-2 (Medway) United Kingdom
- Pulsant Edinburgh SC-1 United Kingdom
- Pulsant Maidenhead SE-2 United Kingdom
- Pulsant Reading SE-4 (East) United Kingdom
- Pulsant Birmingham WM-1 United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.