Pulsant Edinburgh SC-3 (Newbridge)

Pulsant Edinburgh SC-3 (Newbridge) is an operational data center operated by Pulsant in Edinburgh, United Kingdom. Our footprint estimate of its power is about 1.9 MW.

Key facts

StatusOperational
OperatorPulsant
Facility power1.9 MW (range 1 MW to 3.1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,615 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 810 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks2 networks
PeeringDB.
Also known asEdinburgh SC-3
Address7 Claylands Road, Newbridge
Coordinates55.92939, -3.41002
Websitepulsant.com

Power and grid

Nearest high-voltage substationBroxburn 132kV Substation, 132 kV, 2.9 km away (SP Transmission)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationSighthilll Substation, 275 kV, 6.5 km away
HV substations within 10 km4
Power plants within 50 km1.3 GW in 31 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature7.8 °C
NASA POWER, average of 2001 to 2025.
Highest temperature26.7 °C (2001 to 2025)
Cooling degree days1 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.45 kWh per m² per day
Wind at 50 m7.4 m/s average
Water stress todayLow (<10%) (Scotland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low (<10%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Pulsant Edinburgh SC-3 (Newbridge) use?

We estimate the facility power at about 1.9 MW. Estimate from building footprint, low confidence.

How close is Pulsant Edinburgh SC-3 (Newbridge) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Broxburn 132kV Substation (132 kV), about 2.9 km away.

How clean is the power for Pulsant Edinburgh SC-3 (Newbridge)?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Who operates Pulsant Edinburgh SC-3 (Newbridge)?

Pulsant.

Data centers near Edinburgh

More Pulsant data centers