Lloyds Banking data center in Colinton
Lloyds Banking data center in Colinton is an operational data center operated by Lloyds Banking in Colinton, United Kingdom. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Lloyds Banking |
| Coordinates | 55.92826, -3.29391 |
Power and grid
| Nearest high-voltage substation | Sighthilll Substation, 275 kV, 700 m away (SP Transmission) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 8 |
| Power plants within 50 km | 1.3 GW in 30 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 7.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 26.7 °C (2001 to 2025) |
| Cooling degree days | 1 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.45 kWh per m² per day |
| Wind at 50 m | 7.4 m/s average |
| Water stress today | Low (<10%) (Scotland) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Lloyds Banking data center in Colinton to the power grid?
The nearest high-voltage substation in OpenStreetMap is Sighthilll Substation (275 kV), about 700 m away.
How clean is the power for Lloyds Banking data center in Colinton?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Lloyds Banking data center in Colinton?
Lloyds Banking.
Data centers near Colinton
- Pulsant Edinburgh SC-1 170 m · 1.4 MW
- Pulsant Edinburgh SC-1 (South Gyle) 284 m
- Pulsant Edinburgh SC-2 (Medway) 322 m · 3.3 MW
- Data center in Colinton 2.7 km
- Pulsant Edinburgh SC-3 (Newbridge) 7.2 km · 1.9 MW
- Sungard Availability Services 13.0 km · 4.4 MW
- RBS Melville Gate Data Centre 13.5 km · 17 MW
- RBS Data Centre 24.5 km · 18 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.