Sungard Availability Services
Sungard Availability Services is an operational data center in Livingston, United Kingdom. Our footprint estimate of its power is about 4.4 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 4.4 MW (range 2.2 MW to 7.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,706 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 55.87628, -3.48129 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 132 kV, 1 km away (SP Energy Networks) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 275 kV, 11.1 km away |
| HV substations within 10 km | 3 |
| Power plants within 50 km | 1.2 GW in 28 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 7.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 26.7 °C (2001 to 2025) |
| Cooling degree days | 1 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.45 kWh per m² per day |
| Wind at 50 m | 7.4 m/s average |
| Water stress today | Low (<10%) (Scotland) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Sungard Availability Services use?
We estimate the facility power at about 4.4 MW. Estimate from building footprint, low confidence.
How close is Sungard Availability Services to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 1 km away.
How clean is the power for Sungard Availability Services?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Data centers near Livingston
- Pulsant Edinburgh SC-3 (Newbridge) 7.4 km · 1.9 MW
- Pulsant Edinburgh SC-2 (Medway) 12.8 km · 3.3 MW
- Lloyds Banking data center in Colinton 13.0 km
- Pulsant Edinburgh SC-1 (South Gyle) 13.0 km
- Pulsant Edinburgh SC-1 13.1 km · 1.4 MW
- Data center in Colinton 15.4 km
- RBS Melville Gate Data Centre 24.7 km · 17 MW
- DataVita DV1 Lanarkshire 29.8 km · 7 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.