RBS Melville Gate Data Centre
RBS Melville Gate Data Centre is an operational data center operated by Natwest in Dalkeith, United Kingdom. Our footprint estimate of its power is about 17 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Natwest |
| Facility power | 17 MW (range 8.4 MW to 27 MW) Estimate from building footprint, low confidence. Footprint estimate: about 14,057 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 7,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 55.89430, -3.08662 |
Power and grid
| Nearest high-voltage substation | Smeaton Substation, 400 kV, 3.5 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 5 |
| Power plants within 50 km | 686 MW in 24 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 8.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 25.5 °C (2001 to 2025) |
| Cooling degree days | 1 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.45 kWh per m² per day |
| Wind at 50 m | 7.7 m/s average |
| Water stress today | Low (<10%) (Scotland) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does RBS Melville Gate Data Centre use?
We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.
How close is RBS Melville Gate Data Centre to the power grid?
The nearest high-voltage substation in OpenStreetMap is Smeaton Substation (400 kV), about 3.5 km away.
How clean is the power for RBS Melville Gate Data Centre?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates RBS Melville Gate Data Centre?
Natwest.
Data centers near Dalkeith
- Data center in Colinton 10.8 km
- RBS Data Centre 12.9 km · 18 MW
- Lloyds Banking data center in Colinton 13.5 km
- Pulsant Edinburgh SC-1 13.5 km · 1.4 MW
- Pulsant Edinburgh SC-2 (Medway) 13.5 km · 3.3 MW
- Pulsant Edinburgh SC-1 (South Gyle) 13.7 km
- Pulsant Edinburgh SC-3 (Newbridge) 20.5 km · 1.9 MW
- Sungard Availability Services 24.7 km · 4.4 MW
More Natwest data centers
- RBS Data Centre United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.