Data Center Directory

Pulsant Birmingham WM-1

Pulsant Birmingham WM-1 is an operational data center operated by Pulsant in Birmingham, United Kingdom. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorPulsant
Networks1 networks
PeeringDB.
AddressCole Valley, 20 Westwood Ave
Coordinates52.45149, -1.85318
Websitepulsant.com

Power and grid

Nearest high-voltage substationSparkbrook Substation, 132 kV, 1.2 km away (National Grid Electricity Distribution)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationNechells East Transmission Substation, 275 kV, 6.2 km away
HV substations within 10 km32
Power plants within 50 km2.4 GW in 115 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature9.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature32 °C (2001 to 2025)
Cooling degree days18 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.88 kWh per m² per day
Wind at 50 m7.1 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How close is Pulsant Birmingham WM-1 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Sparkbrook Substation (132 kV), about 1.2 km away.

How clean is the power for Pulsant Birmingham WM-1?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Who operates Pulsant Birmingham WM-1?

Pulsant.

Data centers near Birmingham

More Pulsant data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.