Data Center Directory

Hutchison 3G

Hutchison 3G is an operational data center in Wednesbury, United Kingdom. Our footprint estimate of its power is about 6.3 MW.

Key facts

StatusOperational
Facility power6.3 MW (range 3.2 MW to 10 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 5,264 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressWS10 7WP, Wednesbury
Coordinates52.54730, -2.03056

Power and grid

Nearest high-voltage substationUnnamed substation, 275 kV, 500 m away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km29
Power plants within 50 km1.8 GW in 86 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature9.6 °C
NASA POWER, average of 2001 to 2025.
Highest temperature32 °C (2001 to 2025)
Cooling degree days18 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.88 kWh per m² per day
Wind at 50 m7.1 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Hutchison 3G use?

We estimate the facility power at about 6.3 MW. Estimate from building footprint, low confidence.

How close is Hutchison 3G to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (275 kV), about 500 m away.

How clean is the power for Hutchison 3G?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Data centers near Wednesbury

Sources

Correct this page or get the data