Evoque Data Center Solutions
Evoque Data Center Solutions is an operational data center in Redditch, United Kingdom. Our footprint estimate of its power is about 11 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 11 MW (range 5.7 MW to 18 MW) Estimate from building footprint, low confidence. Footprint estimate: about 9,525 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Ravensbank Drive, B98 9NA, Redditch |
| Coordinates | 52.31219, -1.88337 |
Power and grid
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 9.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 32 °C (2001 to 2025) |
| Cooling degree days | 18 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.88 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Evoque Data Center Solutions use?
We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.
How clean is the power for Evoque Data Center Solutions?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Data centers near Redditch
- VeloxServ DC3 - Redditch 3.6 km
- Pulsant Birmingham WM-1 15.6 km
- Ionos data center in Worcester 22.0 km · 7.6 MW
- UK Servers Coventry 22.8 km
- EE Data Centre 25.9 km · 5.2 MW
- Hutchison 3G 28.0 km · 6.3 MW
- Chubb Buildings 34.7 km
- VeloxServ DC1 - Wolverhampton 35.7 km
Sources
Correct this page or get the data