Ionos data center in Worcester
Ionos data center in Worcester is an operational data center operated by Ionos in Worcester, United Kingdom. Our footprint estimate of its power is about 7.6 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Ionos |
| Facility power | 7.6 MW (range 3.8 MW to 12 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,321 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,200 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Opened | 2022 |
| Coordinates | 52.20590, -2.15669 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 132 kV, 2.8 km away (National Grid Electricity Distribution) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 275 kV, 13.2 km away |
| HV substations within 10 km | 3 |
| Power plants within 50 km | 1.8 GW in 68 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 9.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.5 °C (2001 to 2025) |
| Cooling degree days | 24 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.88 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Ionos data center in Worcester use?
We estimate the facility power at about 7.6 MW. Estimate from building footprint, low confidence.
How close is Ionos data center in Worcester to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 2.8 km away.
How clean is the power for Ionos data center in Worcester?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Ionos data center in Worcester?
Ionos.
Data centers near Worcester
- VeloxServ DC3 - Redditch 19.0 km
- Evoque Data Center Solutions 22.0 km · 11 MW
- Pulsant Birmingham WM-1 34.2 km
- Safehosts Cheltenham 35.3 km
- EE Data Centre 37.2 km · 5.2 MW
- Indectron GCR1 - Gloucester, Shield House 38.1 km
- Hutchison 3G 38.9 km · 6.3 MW
- Chubb Buildings 42.5 km
Sources
Correct this page or get the data