CSquare London LHR3
CSquare London LHR3 is an operational data center operated by CSquare in Lower Earley, United Kingdom. Our footprint estimate of its power is about 20 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CSquare |
| Facility power | 20 MW (range 9.9 MW to 32 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,214 m² building outline x 2 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 8,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 51.43735, -0.88738 |
Power and grid
| Nearest high-voltage substation | Reading Main Substation, 132 kV, 3.6 km away (Scottish and Southern Electricity Networks) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Bramley Substation, 400 kV, 17.3 km away |
| HV substations within 10 km | 7 |
| Power plants within 50 km | 3.0 GW in 78 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.5 °C (2001 to 2025) |
| Cooling degree days | 44 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.94 kWh per m² per day |
| Wind at 50 m | 7.2 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does CSquare London LHR3 use?
We estimate the facility power at about 20 MW. Estimate from building footprint, low confidence.
How close is CSquare London LHR3 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Reading Main Substation (132 kV), about 3.6 km away.
How clean is the power for CSquare London LHR3?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates CSquare London LHR3?
CSquare.
Data centers near Lower Earley
- Centersquare London (LHR3) 458 m
- Microsoft Thames Valley Park Data Centre 3.8 km
- Pulsant Reading SE-4 (East) 4.5 km · 0.9 MW
- Asanti - Reading 6.0 km · 2.1 MW
- Pulsant 6.2 km · 1.1 MW
- Wavenet Reading 6.2 km
- Redcentric Reading 6.4 km · 3.7 MW
- Pulsant Reading SE-3 (South) 6.5 km · 7.1 MW
More CSquare data centers
- Csquare SFO2 United States
- Csquare SFO1 United States
- Csquare SFO4 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.