Microsoft Thames Valley Park Data Centre

Microsoft Thames Valley Park Data Centre is an operational data center operated by Microsoft in Reading, United Kingdom. No power figure is public for this site yet. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).

Key facts

StatusOperational
OperatorMicrosoft
AI chipsNVIDIA GPUs (some Microsoft Maia)
Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips.
Coordinates51.46147, -0.92597

Power and grid

Nearest high-voltage substationUnnamed substation, 132 kV, 300 m away (Scottish and Southern Electricity Networks)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationUnnamed substation, 400 kV, 17.3 km away
HV substations within 10 km5
Power plants within 50 km3.1 GW in 86 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature10.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature35.5 °C (2001 to 2025)
Cooling degree days44 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.94 kWh per m² per day
Wind at 50 m7.2 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

What chips does Microsoft Thames Valley Park Data Centre use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).

How close is Microsoft Thames Valley Park Data Centre to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 300 m away.

How clean is the power for Microsoft Thames Valley Park Data Centre?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Who operates Microsoft Thames Valley Park Data Centre?

Microsoft.