Microsoft Thames Valley Park Data Centre is an operational data center operated by Microsoft in Reading, United Kingdom. No power figure is public for this site yet. Likely chips: NVIDIA GPUs (some Microsoft Maia) (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | Microsoft |
| AI chips | NVIDIA GPUs (some Microsoft Maia) Guess from the operator, not confirmed. Microsoft AI capacity is mostly NVIDIA, with a few in-house Maia chips. |
| Coordinates | 51.46147, -0.92597 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 132 kV, 300 m away (Scottish and Southern Electricity Networks) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Unnamed substation, 400 kV, 17.3 km away |
| HV substations within 10 km | 5 |
| Power plants within 50 km | 3.1 GW in 86 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.1 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.5 °C (2001 to 2025) |
| Cooling degree days | 44 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.94 kWh per m² per day |
| Wind at 50 m | 7.2 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
What chips does Microsoft Thames Valley Park Data Centre use?
No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (some Microsoft Maia).
How close is Microsoft Thames Valley Park Data Centre to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 300 m away.
How clean is the power for Microsoft Thames Valley Park Data Centre?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Microsoft Thames Valley Park Data Centre?
Microsoft.
Data centers near Reading
- Pulsant Reading SE-4 (East) 1.3 km · 0.9 MW
- CSquare London LHR3 3.8 km · 20 MW
- Pulsant 3.9 km · 1.1 MW
- Centersquare London (LHR3) 4.0 km
- Asanti - Reading 5.1 km · 2.1 MW
- Wavenet Reading 5.2 km
- Pulsant Reading SE-3 (South) 5.3 km · 7.1 MW
- Redcentric Reading 5.7 km · 3.7 MW
More Microsoft data centers
- Microsoft Fairwater Wisconsin United States
- Crusoe Abilene Expansion United States
- Microsoft Fairwater Atlanta United States
- Microsoft Goodyear United States
- Microsoft Boydton Data Center United States
- Microsoft Project Osmium United States
- OpenAI/Microsoft Goodyear Arizona United States
- Microsoft CYS Datacenter United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.