Digital Realty London LGW14
Digital Realty London LGW14 is an operational data center operated by Digital Realty in Woking, United Kingdom. Our footprint estimate of its power is about 34 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Digital Realty |
| Facility power | 34 MW (range 17 MW to 54 MW) Estimate from building footprint, low confidence. Footprint estimate: about 28,144 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 15,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 11 networks PeeringDB. |
| Also known as | Digital Realty LGW14 |
| Address | Unit 21, Goldsworth Park Trading Estate, Kestrel Way |
| Coordinates | 51.32350, -0.58700 |
| Website | digitalrealty.com/data-centers/london/unit-21-goldsworth-park-trading-estate-woking |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 132 kV, 100 m away (UK Power Networks) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | West Weybridge Substation, 400 kV, 7.7 km away |
| HV substations within 10 km | 5 |
| Power plants within 50 km | 1.1 GW in 77 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.9 °C (2001 to 2025) |
| Cooling degree days | 53 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.94 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Digital Realty London LGW14 use?
We estimate the facility power at about 34 MW. Estimate from building footprint, low confidence.
How close is Digital Realty London LGW14 to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (132 kV), about 100 m away.
How clean is the power for Digital Realty London LGW14?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Digital Realty London LGW14?
Digital Realty.
Data centers near Woking
- Navisite Woking UK 58 m
- Ark Data Centres - Longcross Park 6.4 km · 9.7 MW
- 4D Surrey 7.9 km · 1 MW
- Gravity Edge LDN1 12.5 km · 37 MW
- Lincoln Rackhouse London 12.6 km
- Asanti - Farnborough 14.4 km
- Datum 15.1 km
- Surrey Data Park 15.3 km · 3.3 MW
More Digital Realty data centers
- Digital Realty CH1 - Chicago United States
- Digital Realty IAD39 United States
- Digital Realty IAD51 United States
- Digital Realty IAD44 United States
- Digital Realty IAD41 United States
- Digital Realty Singapore SIN11 Singapore
- Digital Realty Toronto YYZ11 Canada
- Digital Realty IAD43 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.