4D Surrey is an operational data center operated by 4D Data Centres in Byfleet, United Kingdom. Our footprint estimate of its power is about 1 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | 4D Data Centres |
| Facility power | 1 MW (range 0.5 MW to 1.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 871 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 430 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 5 networks PeeringDB. |
| Also known as | Redcentric Byfleet |
| Address | 122 Oyster Lane |
| Coordinates | 51.34729, -0.48017 |
| Website | 4d-dc.com |
Power and grid
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34.9 °C (2001 to 2025) |
| Cooling degree days | 53 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.94 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does 4D Surrey use?
We estimate the facility power at about 1 MW. Estimate from building footprint, low confidence.
How clean is the power for 4D Surrey?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates 4D Surrey?
4D Data Centres.
Data centers near Byfleet
- Navisite Woking UK 7.8 km
- Digital Realty London LGW14 7.9 km · 34 MW
- Ark Data Centres - Longcross Park 8.8 km · 9.7 MW
- Serverfarm LON1 – London Data Center 11.2 km · 6.5 MW
- DataBank London (LHR1) 11.3 km
- Digital Realty LHR13 13.3 km · 9.2 MW
- Verizon UK4 13.4 km · 5.6 MW
- BA Boadicea House Data Centre 14.3 km · 5 MW
More 4D Data Centres data centers
- 4D Gatwick (Crawley) United Kingdom
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.