4D Gatwick (Crawley)
4D Gatwick (Crawley) is an operational data center operated by 4D Data Centres in Crawley, United Kingdom. Our footprint estimate of its power is about 1.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | 4D Data Centres |
| Facility power | 1.4 MW (range 0.7 MW to 2.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,184 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 4 networks PeeringDB. |
| Also known as | 4D Data Centers - Gatwick |
| Address | 17-19 Kelvin Lane |
| Coordinates | 51.13289, -0.17656 |
| Website | 4d-dc.com |
Power and grid
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 30.7 °C (2001 to 2025) |
| Cooling degree days | 27 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 7.5 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does 4D Gatwick (Crawley) use?
We estimate the facility power at about 1.4 MW. Estimate from building footprint, low confidence.
How clean is the power for 4D Gatwick (Crawley)?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates 4D Gatwick (Crawley)?
4D Data Centres.
Data centers near Crawley
- Digital Realty LGW15 609 m · 12 MW
- Restore Records Management 7.4 km · 15 MW
- Goldman Sachs data center in East Grinstead 9.4 km · 11 MW
- Unit 2 12.8 km · 3.6 MW
- Navisite Redhill UK 12.8 km · 12 MW
- IBM Horsham 17.3 km · 9.4 MW
- Pulsant Croydon LN-1 24.9 km · 4.5 MW
- Digital Realty LHR13 27.4 km · 9.2 MW
More 4D Data Centres data centers
- 4D Surrey United Kingdom
Sources