Data Center Directory

Unit 2

Unit 2 is an operational data center operated by Galaxy Data Centers in Redhill, United Kingdom. Our footprint estimate of its power is about 3.6 MW. Likely chips: NVIDIA GPUs (AMD possible) (guess).

Key facts

StatusOperational
OperatorGalaxy Data Centers
Facility power3.6 MW (range 1.8 MW to 5.8 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 3,023 m² building outline x 1 floor(s) x 1.2 kW/m².
AI chipsNVIDIA GPUs (AMD possible)
Guess from the operator, not confirmed. GPU cloud and AI hosting firms mostly deploy NVIDIA, a few deploy AMD.
GPU capacity if all AIabout 1,500 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asUnit 1
Coordinates51.24764, -0.15862

Satellite view

Questions

How much power does Unit 2 use?

We estimate the facility power at about 3.6 MW. Estimate from building footprint, low confidence.

What chips does Unit 2 use?

No chips are reported. Based on the operator, the likely chips are NVIDIA GPUs (AMD possible).

Who operates Unit 2?

Galaxy Data Centers.

Data centers near Redhill

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.