Croydon is an operational data center operated by CapitaLand Digital in Croydon, United Kingdom. Our footprint estimate of its power is about 11 MW.

Key facts

StatusOperational
OperatorCapitaLand Digital
Facility power11 MW (range 5.4 MW to 17 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 8,976 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 4,700 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Also known asCapitalLand - Croyden
Address2 Greenland Way, Unit B Prologis Park
Coordinates51.38489, -0.13706
Websitecapitaland.com/en/find-a-property/global-property-listing/data-centres/croydon.html

Power and grid

Grid carbon intensity218 g CO₂ per kWh (United Kingdom, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2%

Climate and water

Average temperature10.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature34 °C (2001 to 2025)
Cooling degree days46 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.97 kWh per m² per day
Wind at 50 m7.2 m/s average
Water stress todayLow - Medium (10-20%) (England)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Croydon use?

We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.

How clean is the power for Croydon?

The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.

Who operates Croydon?

CapitaLand Digital.

Data centers near Croydon

More CapitaLand Digital data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.