Croydon
Croydon is an operational data center operated by CapitaLand Digital in Croydon, United Kingdom. Our footprint estimate of its power is about 11 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CapitaLand Digital |
| Facility power | 11 MW (range 5.4 MW to 17 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,976 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Also known as | CapitalLand - Croyden |
| Address | 2 Greenland Way, Unit B Prologis Park |
| Coordinates | 51.38489, -0.13706 |
| Website | capitaland.com/en/find-a-property/global-property-listing/data-centres/croydon.html |
Power and grid
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 34 °C (2001 to 2025) |
| Cooling degree days | 46 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 7.2 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Croydon use?
We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.
How clean is the power for Croydon?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Croydon?
CapitaLand Digital.
Data centers near Croydon
- Segro Croydon (Morgan Stanley) 129 m · 24 MW
- Pulsant Croydon LN-1 3.7 km · 4.5 MW
- WRN Broadcast 10.8 km · 1.1 MW
- Digital Realty LHR13 10.9 km · 9.2 MW
- Citibank Riverdale Data Centre 12.0 km · 17 MW
- Netwise London Central (NLC) 13.3 km
- Digital Realty London LHR13 14.3 km
- DataGrid Network London 14.4 km
More CapitaLand Digital data centers
- CapitaLand 9 Tai Seng Singapore
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.