Goldman Sachs data center in East Grinstead
Goldman Sachs data center in East Grinstead is an operational data center operated by Goldman Sachs in East Grinstead, United Kingdom. Our footprint estimate of its power is about 11 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Goldman Sachs |
| Facility power | 11 MW (range 5.3 MW to 17 MW) Estimate from building footprint, low confidence. Footprint estimate: about 8,809 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 4,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Hills Road, RH19 1XZ, East Grinstead |
| Coordinates | 51.13546, -0.04199 |
Power and grid
| Nearest high-voltage substation | Dormansland Grid, 132 kV, 4.6 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Rampion Wind Farm Onshore Substation, 400 kV, 22.1 km away |
| HV substations within 10 km | 4 |
| Power plants within 50 km | 1.8 GW in 79 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 10.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 30.7 °C (2001 to 2025) |
| Cooling degree days | 27 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.97 kWh per m² per day |
| Wind at 50 m | 7.5 m/s average |
| Water stress today | Low - Medium (10-20%) (England) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Goldman Sachs data center in East Grinstead use?
We estimate the facility power at about 11 MW. Estimate from building footprint, low confidence.
How close is Goldman Sachs data center in East Grinstead to the power grid?
The nearest high-voltage substation in OpenStreetMap is Dormansland Grid (132 kV), about 4.6 km away.
How clean is the power for Goldman Sachs data center in East Grinstead?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates Goldman Sachs data center in East Grinstead?
Goldman Sachs.
Data centers near East Grinstead
- 4D Gatwick (Crawley) 9.4 km · 1.4 MW
- Digital Realty LGW15 9.4 km · 12 MW
- Restore Records Management 11.1 km · 15 MW
- Navisite Redhill UK 14.8 km · 12 MW
- Unit 2 14.9 km · 3.6 MW
- Pulsant Croydon LN-1 24.8 km · 4.5 MW
- IBM Horsham 25.0 km · 9.4 MW
- Segro Croydon (Morgan Stanley) 28.4 km · 24 MW
Sources