Datacenter IBM - Grabels is an operational data center operated by IBM in Grabels, France. Our footprint estimate of its power is about 5.2 MW.

Key facts

StatusOperational
OperatorIBM
Facility power5.2 MW (range 2.6 MW to 8.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 4,323 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 2,200 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressImpasse André Magnol
Coordinates43.64269, 3.82989

Power and grid

Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature15.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.1 °C (2001 to 2025)
Cooling degree days595 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.41 kWh per m² per day
Wind at 50 m6.4 m/s average
Water stress todayLow - Medium (10-20%) (Occitanie)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Datacenter IBM - Grabels use?

We estimate the facility power at about 5.2 MW. Estimate from building footprint, low confidence.

How clean is the power for Datacenter IBM - Grabels?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.

Who operates Datacenter IBM - Grabels?

IBM.

Data centers near Grabels

More IBM data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.