GENCI Adastra
GENCI Adastra is an operational AI data center operated by GENCI in Montpellier, France. Its power is about 1.6 MW. Epoch AI estimates about 262 H100-equivalent AI chips (AMD Radeon Instinct MI250X).
Key facts
| Status | Operational |
|---|---|
| Operator | GENCI |
| Facility power | 1.6 MW Reported (Epoch AI or owner data) |
| AI compute | 262 H100-equivalents |
| AI chips | AMD Radeon Instinct MI250X Reported (Epoch AI or owner data) |
| Chip count | 1,352 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 690 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Montpellier, France |
| Coordinates | 43.61007, 3.87727 |
Power and grid
| Nearest high-voltage substation | Poste électrique du Peyrou, 225 kV, 1 km away (Enedis) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 6 |
| Power plants within 50 km | 161 MW in 30 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 15.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.1 °C (2001 to 2025) |
| Cooling degree days | 595 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.41 kWh per m² per day |
| Wind at 50 m | 6.4 m/s average |
| Water stress today | Low - Medium (10-20%) (Occitanie) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| GENCI Adastra | AMD Radeon Instinct MI250X | 1,352 | 1.6 MW | 2022-06-01 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does GENCI Adastra use?
Public data puts the facility power at about 1.6 MW. Reported (Epoch AI or owner data).
What chips does GENCI Adastra use?
Reported chips: AMD Radeon Instinct MI250X.
How close is GENCI Adastra to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique du Peyrou (225 kV), about 1 km away.
How clean is the power for GENCI Adastra?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates GENCI Adastra?
GENCI.
Data centers near Montpellier
- Cogent Montpellier 857 m
- Cogent Montpellier 1.6 km · 1.3 MW
- UltraEdge Montpellier 1.6 km
- Data center in Montpellier 2.8 km · 2.7 MW
- Montpellier Internet Telecom Datacenter 2.9 km · 0.6 MW
- SFR data center in Montpellier 3.0 km · 2.1 MW
- Bouygues Télécom data center in Montpellier 3.0 km · 1.9 MW
- Datacenter France Travail 3.1 km · 2.3 MW
More GENCI data centers
- Jean Zay Supercomputer France
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.