Data Center Directory

GENCI Adastra

GENCI Adastra is an operational AI data center operated by GENCI in Montpellier, France. Its power is about 1.6 MW. Epoch AI estimates about 262 H100-equivalent AI chips (AMD Radeon Instinct MI250X).

Key facts

StatusOperational
OperatorGENCI
Facility power1.6 MW
Reported (Epoch AI or owner data)
AI compute262 H100-equivalents
AI chipsAMD Radeon Instinct MI250X
Reported (Epoch AI or owner data)
Chip count1,352
Largest reported cluster at this site (Epoch AI).
GPU capacity if all AIabout 690 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressMontpellier, France
Coordinates43.61007, 3.87727

Power and grid

Nearest high-voltage substationPoste électrique du Peyrou, 225 kV, 1 km away (Enedis)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km6
Power plants within 50 km161 MW in 30 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature15.2 °C
NASA POWER, average of 2001 to 2025.
Highest temperature41.1 °C (2001 to 2025)
Cooling degree days595 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.41 kWh per m² per day
Wind at 50 m6.4 m/s average
Water stress todayLow - Medium (10-20%) (Occitanie)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

GPU clusters at this site

ClusterChipsCountPowerSince
GENCI AdastraAMD Radeon Instinct MI250X1,3521.6 MW2022-06-01

Source: Epoch AI GPU Clusters.

Satellite view

Questions

How much power does GENCI Adastra use?

Public data puts the facility power at about 1.6 MW. Reported (Epoch AI or owner data).

What chips does GENCI Adastra use?

Reported chips: AMD Radeon Instinct MI250X.

How close is GENCI Adastra to the power grid?

The nearest high-voltage substation in OpenStreetMap is Poste électrique du Peyrou (225 kV), about 1 km away.

How clean is the power for GENCI Adastra?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.

Who operates GENCI Adastra?

GENCI.

Data centers near Montpellier

More GENCI data centers

Sources