Jean Zay Supercomputer is an operational AI data center operated by GENCI in Bures-sur-Yvette, France. Its power is about 2.4 MW. Epoch AI estimates about 1,587 H100-equivalent AI chips (NVIDIA Tesla V100 SXM2 32 GB, NVIDIA Tesla V100 SXM2, NVIDIA A100, NVIDIA H100 SXM5 80GB, NVIDIA A100 SXM4 80 GB).
Key facts
| Status | Operational |
|---|---|
| Operator | GENCI |
| Facility power | 2.4 MW Reported (Epoch AI or owner data) |
| AI compute | 1,587 H100-equivalents |
| AI chips | NVIDIA Tesla V100 SXM2 32 GB, NVIDIA Tesla V100 SXM2, NVIDIA A100, NVIDIA H100 SXM5 80GB, NVIDIA A100 SXM4 80 GB Reported (Epoch AI or owner data) |
| Chip count | 3,704 Largest reported cluster at this site (Epoch AI). |
| GPU capacity if all AI | about 1,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Campus universitaire d'Orsay, Batiment 506, Rue John Von Neumann, 91403 Orsay, France |
| Coordinates | 48.70682, 2.17565 |
Power and grid
| Nearest high-voltage substation | Poste source Enedis, 225 kV, 2.4 km away (Enedis) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 11 |
| Power plants within 50 km | 1.9 GW in 47 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.7 °C (2001 to 2025) |
| Cooling degree days | 130 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.31 kWh per m² per day |
| Wind at 50 m | 6.4 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
GPU clusters at this site
| Cluster | Chips | Count | Power | Since |
|---|---|---|---|---|
| Jean Zay Supercomputer Phase 1 | NVIDIA Tesla V100 SXM2 32 GB | 1,044 | 0.7 MW | 2019-06-01 |
| Jean Zay Supercomputer Phase 2 | NVIDIA Tesla V100 SXM2 | 2,696 | 1.8 MW | 2020-06-01 |
| Jean Zay Supercomputer Phase 3 | NVIDIA A100 + NVIDIA Tesla V100 SXM2 | 3,112 | 2.1 MW | 2022-06-01 |
| Jean Zay Supercomputer Phase 4 | NVIDIA H100 SXM5 80GB + NVIDIA A100 SXM4 80 GB | 3,704 | 2.4 MW | 2024-09-15 |
Source: Epoch AI GPU Clusters.
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Jean Zay Supercomputer use?
Public data puts the facility power at about 2.4 MW. Reported (Epoch AI or owner data).
What chips does Jean Zay Supercomputer use?
Reported chips: NVIDIA Tesla V100 SXM2 32 GB, NVIDIA Tesla V100 SXM2, NVIDIA A100, NVIDIA H100 SXM5 80GB, NVIDIA A100 SXM4 80 GB.
How close is Jean Zay Supercomputer to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste source Enedis (225 kV), about 2.4 km away.
How clean is the power for Jean Zay Supercomputer?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates Jean Zay Supercomputer?
GENCI.
Data centers near Bures-sur-Yvette
- Alionis VBO 3.4 km
- COLT DC Paris II 3.8 km
- Colt Paris 3 3.9 km · 17 MW
- Data center in Orsay 4.0 km · 25 MW
- Digital Realty Paris PAR13 4.0 km
- DATA4 Paris Marcoussis PAR2 5.3 km · 3.7 MW
- DATA4 Paris Marcoussis PAR2 5.6 km
- Data4 Campus Nozay PAR3 6.3 km · 17 MW