Data4 Campus Nozay PAR3

Data4 Campus Nozay PAR3 is a data center under construction operated by Data4 in La Ville-du-Bois, France. Our footprint estimate of its power is about 17 MW.

Key facts

StatusUnder construction
OperatorData4
Facility power17 MW (range 7 MW to 44 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 145,064 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 7,300 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates48.66764, 2.23760

Power and grid

Nearest high-voltage substationPoste électrique de Villejust, 400 kV, 1.1 km away (RTE)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km11
Power plants within 50 km1.9 GW in 48 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.7 °C (2001 to 2025)
Cooling degree days130 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.31 kWh per m² per day
Wind at 50 m6.4 m/s average
Water stress todayLow - Medium (10-20%) (France)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data4 Campus Nozay PAR3 use?

We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.

How close is Data4 Campus Nozay PAR3 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Poste électrique de Villejust (400 kV), about 1.1 km away.

How clean is the power for Data4 Campus Nozay PAR3?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.

Who operates Data4 Campus Nozay PAR3?

Data4.