Data4 Campus Nozay PAR3
Data4 Campus Nozay PAR3 is a data center under construction operated by Data4 in La Ville-du-Bois, France. Our footprint estimate of its power is about 17 MW.
Key facts
| Status | Under construction |
|---|---|
| Operator | Data4 |
| Facility power | 17 MW (range 7 MW to 44 MW) Estimate from building footprint, low confidence. Footprint estimate: about 145,064 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 7,300 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 48.66764, 2.23760 |
Power and grid
| Nearest high-voltage substation | Poste électrique de Villejust, 400 kV, 1.1 km away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 11 |
| Power plants within 50 km | 1.9 GW in 48 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.7 °C (2001 to 2025) |
| Cooling degree days | 130 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.31 kWh per m² per day |
| Wind at 50 m | 6.4 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data4 Campus Nozay PAR3 use?
We estimate the facility power at about 17 MW. Estimate from building footprint, low confidence.
How close is Data4 Campus Nozay PAR3 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique de Villejust (400 kV), about 1.1 km away.
How clean is the power for Data4 Campus Nozay PAR3?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates Data4 Campus Nozay PAR3?
Data4.
Data centers near La Ville-du-Bois
- DATA4 Paris Marcoussis PAR2 1.9 km
- data4 data center in Marcoussis 2.0 km · 10 MW
- Data4 Campus Paris Saclay 2.1 km · 84 MW
- DATA4 Paris Marcoussis PAR2 2.2 km · 3.7 MW
- data4 data center in Marcoussis 2.3 km · 5.9 MW
- Data center in Orsay 2.4 km · 25 MW
- Digital Realty Paris PAR13 2.7 km
- Alionis VBO 2.9 km
More Data4 data centers
- Data4 Campus Paris Saclay France
- data4 data center in Marcoussis France
- Data 4 MAD2 Campus Spain
- DATA4 - MAD1 Spain
- data4 data center in Marcoussis France
- DATA4 Paris Marcoussis PAR2 France
- Data4 Pologne WAW2 Poland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.