data4 data center in Marcoussis
data4 data center in Marcoussis is an operational data center operated by data4 in Marcoussis, France. Our footprint estimate of its power is about 5.9 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | data4 |
| Facility power | 5.9 MW (range 2.9 MW to 9.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 4,902 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 2,500 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 48.64931, 2.22346 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 225 kV, 600 m away (RTE) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 10 |
| Power plants within 50 km | 1.9 GW in 46 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.7 °C (2001 to 2025) |
| Cooling degree days | 130 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.31 kWh per m² per day |
| Wind at 50 m | 6.4 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does data4 data center in Marcoussis use?
We estimate the facility power at about 5.9 MW. Estimate from building footprint, low confidence.
How close is data4 data center in Marcoussis to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (225 kV), about 600 m away.
How clean is the power for data4 data center in Marcoussis?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates data4 data center in Marcoussis?
data4.
Data centers near Marcoussis
- data4 data center in Marcoussis 331 m · 10 MW
- Data4 Campus Paris Saclay 416 m · 84 MW
- DATA4 Paris Marcoussis PAR2 1.7 km
- DATA4 Paris Marcoussis PAR2 2.0 km · 3.7 MW
- Data4 Campus Nozay PAR3 2.3 km · 17 MW
- Digital Realty Paris PAR13 3.3 km
- Colt Paris 3 3.4 km · 17 MW
- Data center in Orsay 3.5 km · 25 MW
More data4 data centers
- Data4 Campus Paris Saclay France
- Data4 Campus Nozay PAR3 France
- data4 data center in Marcoussis France
- Data 4 MAD2 Campus Spain
- DATA4 - MAD1 Spain
- DATA4 Paris Marcoussis PAR2 France
- Data4 Pologne WAW2 Poland
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.