SFR data center in Montpellier
SFR data center in Montpellier is an operational data center operated by SFR in Montpellier, France. Our footprint estimate of its power is about 2.1 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | SFR |
| Facility power | 2.1 MW (range 1.1 MW to 3.4 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,769 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 43.58315, 3.87071 |
Power and grid
| Nearest high-voltage substation | Sous-station SNCF de La Castelle, 225 kV, 1.7 km away (SNCF Réseau) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 6 |
| Power plants within 50 km | 170 MW in 31 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 15.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 41.1 °C (2001 to 2025) |
| Cooling degree days | 595 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.41 kWh per m² per day |
| Wind at 50 m | 6.4 m/s average |
| Water stress today | Low - Medium (10-20%) (Occitanie) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does SFR data center in Montpellier use?
We estimate the facility power at about 2.1 MW. Estimate from building footprint, low confidence.
How close is SFR data center in Montpellier to the power grid?
The nearest high-voltage substation in OpenStreetMap is Sous-station SNCF de La Castelle (225 kV), about 1.7 km away.
How clean is the power for SFR data center in Montpellier?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates SFR data center in Montpellier?
SFR.
Data centers near Montpellier
- Montpellier Internet Telecom Datacenter 184 m · 0.6 MW
- Bouygues Télécom data center in Montpellier 249 m · 1.9 MW
- UltraEdge Montpellier 1.5 km
- Cogent Montpellier 2.1 km · 1.3 MW
- GENCI Adastra 3.0 km · 1.6 MW
- Cogent Montpellier 3.2 km
- Data center in Montpellier 5.1 km · 2.7 MW
- Datacenter France Travail 5.7 km · 2.3 MW
More SFR data centers
- Le Prologue France
- SFR Netcenter Bordeaux France
- Site technique SFR France
- Site technique SFR France
- SFR France
- SFR data center in Saint-Martin-d'Hères France
- Site technique SFR France
- SFR data center in Saint-Herblain France
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.