Le Prologue
Le Prologue is an operational data center operated by SFR in Courbevoie, France. Our footprint estimate of its power is about 27 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | SFR |
| Facility power | 27 MW (range 13 MW to 43 MW) Estimate from building footprint, low confidence. Footprint estimate: about 22,372 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 12,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 48.90428, 2.25922 |
Power and grid
| Nearest high-voltage substation | Poste électrique d'Alsace, 225 kV, 1.7 km away (Enedis) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 59 |
| Power plants within 50 km | 2.2 GW in 53 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.6 °C (2001 to 2025) |
| Cooling degree days | 130 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.19 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Le Prologue use?
We estimate the facility power at about 27 MW. Estimate from building footprint, low confidence.
How close is Le Prologue to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique d'Alsace (225 kV), about 1.7 km away.
How clean is the power for Le Prologue?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates Le Prologue?
SFR.
Data centers near Courbevoie
- Equinix PA7 - Paris, Energy Park 68 m · 13 MW
- UltraEdge Paris - Courbevoie 126 m
- Telco Center 207 m
- Groupe Cyllene - DC - Courbevoie 1.1 km
- Cogent Paris 1.3 km
- Completel Val de Reuil 2.0 km
- Groupe Cyllene - DC - Nanterre 2.2 km
- Global Switch Paris 2.7 km · 14 MW
More SFR data centers
- SFR Netcenter Bordeaux France
- Site technique SFR France
- Site technique SFR France
- SFR France
- SFR data center in Saint-Martin-d'Hères France
- Site technique SFR France
- SFR data center in Saint-Herblain France
- SFR data center in Montpellier France
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.