Equinix PA7 - Paris, Energy Park

Equinix PA7 - Paris, Energy Park is an operational data center operated by Equinix in Paris, France. Our footprint estimate of its power is about 13 MW.

Key facts

StatusOperational
OperatorEquinix
Facility power13 MW (range 6.4 MW to 21 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 2,683 m² building outline x 4 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 5,600 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks54 networks, 2 internet exchanges
PeeringDB.
Also known asEquinix PA7 · TelecityGroup Paris Courbevoie · Alphalink Telco Center
Address130-136 Boulevard de Verdun, Energy Park 9
Coordinates48.90489, 2.25920
Websiteequinix.com/locations/france-colocation/paris-data-centers/pa7

Power and grid

Nearest high-voltage substationPoste électrique d'Alsace, 225 kV, 1.7 km away (Enedis)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km59
Power plants within 50 km2.2 GW in 53 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity41 g CO₂ per kWh (France, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9%
Industrial power priceEUR 0.098 per kWh (France, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature10.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature39.6 °C (2001 to 2025)
Cooling degree days130 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.19 kWh per m² per day
Wind at 50 m6.3 m/s average
Water stress todayLow - Medium (10-20%) (France)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Equinix PA7 - Paris, Energy Park use?

We estimate the facility power at about 13 MW. Estimate from building footprint, low confidence.

How close is Equinix PA7 - Paris, Energy Park to the power grid?

The nearest high-voltage substation in OpenStreetMap is Poste électrique d'Alsace (225 kV), about 1.7 km away.

How clean is the power for Equinix PA7 - Paris, Energy Park?

The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.

Who operates Equinix PA7 - Paris, Energy Park?

Equinix.