Telco Center
Telco Center is an operational data center operated by TelcoCenter in Courbevoie, France. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | TelcoCenter |
| Networks | 11 networks PeeringDB. |
| Address | 53 AVENUE DE L'EUROPE |
| Coordinates | 48.90607, 2.25846 |
| Website | alphalink.fr |
Power and grid
| Nearest high-voltage substation | Poste électrique d'Alsace, 225 kV, 1.8 km away (Enedis) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 59 |
| Power plants within 50 km | 2.2 GW in 53 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.6 °C (2001 to 2025) |
| Cooling degree days | 130 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.19 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is Telco Center to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste électrique d'Alsace (225 kV), about 1.8 km away.
How clean is the power for Telco Center?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates Telco Center?
TelcoCenter.
Data centers near Courbevoie
- Equinix PA7 - Paris, Energy Park 142 m · 13 MW
- Le Prologue 207 m · 27 MW
- UltraEdge Paris - Courbevoie 264 m
- Groupe Cyllene - DC - Courbevoie 1.2 km
- Cogent Paris 1.2 km
- Groupe Cyllene - DC - Nanterre 2.1 km
- Completel Val de Reuil 2.2 km
- Global Switch Paris 2.8 km · 14 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.