IBM Gigaplex is an operational data center operated by IBM in Meyrin, Switzerland. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | IBM |
| Networks | 3 networks PeeringDB. |
| Address | Route des Moulières 12 |
| Coordinates | 46.22043, 6.06632 |
| Website | www-05.ibm.com/ch/presentations/pdf/IBM_Data_Center_Geneva_Overview.pdf |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 130 kV, 1.4 km away (SIG) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Poste électrique de Bois-Tollot, 400 kV, 3.4 km away |
| HV substations within 10 km | 8 |
| Power plants within 50 km | 927 MW in 25 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 39 g CO₂ per kWh (Switzerland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.3%, nuclear 29.9%, solar 12.1%, oil and other fossil 1.9%, bioenergy 1.6%. Clean power: 97.7% |
Climate and water
| Average temperature | 8.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.8 °C (2001 to 2025) |
| Cooling degree days | 133 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.59 kWh per m² per day |
| Wind at 50 m | 3.1 m/s average |
| Water stress today | Low (<10%) (Switzerland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is IBM Gigaplex to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (130 kV), about 1.4 km away.
How clean is the power for IBM Gigaplex?
The grid in Switzerland emits about 39 g CO₂ per kWh (2025). Largest sources: hydro 52.3%, nuclear 29.9%, solar 12.1%.
Who operates IBM Gigaplex?
IBM.
Data centers near Meyrin
- nLighten Geneva GVA1 612 m
- CERN Geneva 1.6 km
- CERN Computer Centre 2.1 km · 26 MW
- Equinix GV2 - Geneva, West 2.8 km · 3.8 MW
- Prévessin Data Centre 4.0 km · 4.4 MW
- Data center in Saint-Genis-Pouilly 4.9 km
- Boxis Genève 6.1 km
- Equinix GV1 - Geneva, City 6.3 km
More IBM data centers
- IBM Auckland New Zealand
- IBM Horsham United Kingdom
- Datacenter IBM - Grabels France
- Datacenter IBM France
- Datacenter IBM France
- Datacenter IBM France
- Datacenter IBM France
- Datacenter IBM France
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.