Equinix GV2 - Geneva, West is an operational data center operated by Equinix in Geneva, Switzerland. Our footprint estimate of its power is about 3.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 3.8 MW (range 1.9 MW to 6.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,165 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 27 networks, 1 internet exchanges PeeringDB. |
| Also known as | Equinix GV2 |
| Address | Route du Bois-des-Fréres 46, Le Lignon |
| Coordinates | 46.20743, 6.09790 |
| Website | equinix.com/locations/switzerland-colocation/geneva-data-centers/gv2 |
Power and grid
| Nearest high-voltage substation | Unnamed substation, 130 kV, 4.1 km away (SIG) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Foretaille, 220 kV, 5.4 km away |
| HV substations within 10 km | 7 |
| Power plants within 50 km | 927 MW in 25 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 39 g CO₂ per kWh (Switzerland, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.3%, nuclear 29.9%, solar 12.1%, oil and other fossil 1.9%, bioenergy 1.6%. Clean power: 97.7% |
Climate and water
| Average temperature | 8.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 35.8 °C (2001 to 2025) |
| Cooling degree days | 133 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.59 kWh per m² per day |
| Wind at 50 m | 3.1 m/s average |
| Water stress today | Low (<10%) (Switzerland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix GV2 - Geneva, West use?
We estimate the facility power at about 3.8 MW. Estimate from building footprint, low confidence.
How close is Equinix GV2 - Geneva, West to the power grid?
The nearest high-voltage substation in OpenStreetMap is an unnamed substation (130 kV), about 4.1 km away.
How clean is the power for Equinix GV2 - Geneva, West?
The grid in Switzerland emits about 39 g CO₂ per kWh (2025). Largest sources: hydro 52.3%, nuclear 29.9%, solar 12.1%.
Who operates Equinix GV2 - Geneva, West?
Equinix.
Data centers near Geneva
- IBM Gigaplex 2.8 km
- Boxis Genève 3.3 km
- nLighten Geneva GVA1 3.4 km
- Equinix GV1 - Geneva, City 3.6 km
- CERN Geneva 4.3 km
- Vaultica Data Centers | GEN01 4.7 km
- CERN Computer Centre 4.9 km · 26 MW
- Prévessin Data Centre 6.2 km · 4.4 MW
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.