Prévessin Data Centre
Prévessin Data Centre is an operational data center operated by CERN in Meyrin, Switzerland. Our footprint estimate of its power is about 4.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | CERN |
| Facility power | 4.4 MW (range 2.2 MW to 7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 3,636 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,900 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Route Adams 775 |
| Coordinates | 46.25541, 6.05642 |
| Website | home.cern/new-data-centre-cern |
Power and grid
| Grid carbon intensity | 39 g CO₂ per kWh (Switzerland, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | hydro 52.3%, nuclear 29.9%, solar 12.1%, oil and other fossil 1.9%, bioenergy 1.6%. Clean power: 97.7% |
Climate and water
| Water stress today | Low (<10%) (Switzerland) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
|---|---|
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Prévessin Data Centre use?
We estimate the facility power at about 4.4 MW. Estimate from building footprint, low confidence.
How clean is the power for Prévessin Data Centre?
The grid in Switzerland emits about 39 g CO₂ per kWh (2025). Largest sources: hydro 52.3%, nuclear 29.9%, solar 12.1%.
Who operates Prévessin Data Centre?
CERN.
Data centers near Meyrin
- CERN Geneva 2.5 km
- CERN Computer Centre 2.7 km · 26 MW
- Data center in Saint-Genis-Pouilly 2.8 km
- nLighten Geneva GVA1 3.5 km
- IBM Gigaplex 4.0 km
- Equinix GV2 - Geneva, West 6.2 km · 3.8 MW
- Equinix GV1 - Geneva, City 8.9 km
- Boxis Genève 9.3 km
More CERN data centers
- CERN Computer Centre Switzerland
- CERN Geneva Switzerland