BNP Paribas Centre de Traitement Informatique (CTI) Marne Nord
BNP Paribas Centre de Traitement Informatique (CTI) Marne Nord is an operational data center operated by BNP Paribas in Bussy-Saint-Georges, France. Our footprint estimate of its power is about 18 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | BNP Paribas |
| Facility power | 18 MW (range 8.8 MW to 28 MW) Estimate from building footprint, low confidence. Footprint estimate: about 14,631 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 7,700 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Avenue Gutenberg 6 BIS |
| Coordinates | 48.83028, 2.72947 |
Power and grid
| Nearest high-voltage substation | Poste source de Génitoy, 225 kV, 400 m away (Enedis) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 9 |
| Power plants within 50 km | 2.1 GW in 48 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 41 g CO₂ per kWh (France, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 68.3%, hydro 10.3%, wind 8.8%, solar 5.6%, gas 3%. Clean power: 94.9% |
| Industrial power price | EUR 0.098 per kWh (France, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 10.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 39.6 °C (2001 to 2025) |
| Cooling degree days | 130 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.19 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | Low - Medium (10-20%) (France) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does BNP Paribas Centre de Traitement Informatique (CTI) Marne Nord use?
We estimate the facility power at about 18 MW. Estimate from building footprint, low confidence.
How close is BNP Paribas Centre de Traitement Informatique (CTI) Marne Nord to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste source de Génitoy (225 kV), about 400 m away.
How clean is the power for BNP Paribas Centre de Traitement Informatique (CTI) Marne Nord?
The grid in France emits about 41 g CO₂ per kWh (2025). Largest sources: nuclear 68.3%, hydro 10.3%, wind 8.8%.
Who operates BNP Paribas Centre de Traitement Informatique (CTI) Marne Nord?
BNP Paribas.
Data centers near Bussy-Saint-Georges
- Euroclear 198 m · 7.4 MW
- Digital Realty Paris PAR12 943 m · 16 MW
- Datacenter IBM 2.7 km · 1.1 MW
- Datacenter IBM 4.2 km · 4.1 MW
- Banque de France data center in Lagny-sur-Marne 4.4 km · 9.1 MW
- BNP Paribas (Hello Bank!) 5.4 km · 2.1 MW
- Datacenter Vega 5.7 km · 20 MW
- APPLIWAVE - CBO 6.5 km
More BNP Paribas data centers
- BNP Paribas Marne Sud France
- Datacenter BNP France
- BNP Paribas (Hello Bank!) France
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.