Asanti Hamilton
Asanti Hamilton is an operational data center in Glasgow, United Kingdom. Our footprint estimate of its power is about 7 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 7 MW (range 3.5 MW to 11 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,943 m² building outline x 3 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 3,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Lister Way 4, G72 0FT, Glasgow |
| Coordinates | 55.78045, -4.10042 |
Power and grid
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 7.8 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 26.7 °C (2001 to 2025) |
| Cooling degree days | 1 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.45 kWh per m² per day |
| Wind at 50 m | 7.4 m/s average |
| Water stress today | Low (<10%) (Scotland) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Asanti Hamilton use?
We estimate the facility power at about 7 MW. Estimate from building footprint, low confidence.
How clean is the power for Asanti Hamilton?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Data centers near Glasgow
- DataVita DV1 Lanarkshire 11.0 km · 7 MW
- Verizon Glasgow GLSGGB 13.6 km · 13 MW
- DataVita DV2 Glasgow 13.7 km
- iomart DC1 Glasgow 13.9 km · 1.1 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.