iomart DC1 Glasgow
iomart DC1 Glasgow is an operational data center operated by iomart Hosting in Glasgow, United Kingdom. Our footprint estimate of its power is about 1.1 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | iomart Hosting |
| Facility power | 1.1 MW (range 0.5 MW to 1.7 MW) Estimate from building footprint, low confidence. Footprint estimate: about 885 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 470 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 8 networks PeeringDB. |
| Also known as | iomart Glasgow Data Centre |
| Address | 88 Middlesex Street |
| Coordinates | 55.85117, -4.28322 |
| Website | iomart.com |
Power and grid
| Nearest high-voltage substation | Finnieston Substation, 132 kV, 1.4 km away (SP Transmission) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | West George Street Substation, 275 kV, 1.7 km away |
| HV substations within 10 km | 21 |
| Power plants within 50 km | 1.4 GW in 29 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 218 g CO₂ per kWh (United Kingdom, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 31.3%, wind 29.4%, bioenergy 13.9%, nuclear 12.4%, solar 6.6%. Clean power: 64.2% |
Climate and water
| Average temperature | 7.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 26.7 °C (2001 to 2025) |
| Cooling degree days | 1 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 2.33 kWh per m² per day |
| Wind at 50 m | 7.3 m/s average |
| Water stress today | Low (<10%) (Scotland) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does iomart DC1 Glasgow use?
We estimate the facility power at about 1.1 MW. Estimate from building footprint, low confidence.
How close is iomart DC1 Glasgow to the power grid?
The nearest high-voltage substation in OpenStreetMap is Finnieston Substation (132 kV), about 1.4 km away.
How clean is the power for iomart DC1 Glasgow?
The grid in United Kingdom emits about 218 g CO₂ per kWh (2025). Largest sources: gas 31.3%, wind 29.4%, bioenergy 13.9%.
Who operates iomart DC1 Glasgow?
iomart Hosting.
Data centers near Glasgow
- Verizon Glasgow GLSGGB 1.2 km · 13 MW
- DataVita DV2 Glasgow 1.6 km
- Asanti Hamilton 13.9 km · 7 MW
- DataVita DV1 Lanarkshire 20.7 km · 7 MW
More iomart Hosting data centers
- iomart DC5 Maidenhead United Kingdom
- iomart DC3 Nottingham United Kingdom
- iomart DC9 Gosport United Kingdom
- LDeX1 United Kingdom
- LDeX2 United Kingdom
Sources
Correct this page or get the data