Ascent TOR1 is an operational data center operated by Ascent in Grand River South, Canada. Our footprint estimate of its power is about 46 MW.

Key facts

StatusOperational
OperatorAscent
Facility power46 MW (range 23 MW to 74 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 38,423 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 20,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressVondrau Drive 17, N3E 1A6
Coordinates43.42750, -80.37199
Websiteascentcorp.com/datacenters/toronto-data-center

Power and grid

Nearest high-voltage substationPreston TS, 230 kV, 3.6 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km6
Power plants within 50 km651 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity192 g CO₂ per kWh (Canada, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5%

Climate and water

Average temperature7.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36.5 °C (2001 to 2025)
Cooling degree days268 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.71 kWh per m² per day
Wind at 50 m7.1 m/s average
Water stress todayLow - Medium (10-20%) (Ontario)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Ascent TOR1 use?

We estimate the facility power at about 46 MW. Estimate from building footprint, low confidence.

How close is Ascent TOR1 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Preston TS (230 kV), about 3.6 km away.

How clean is the power for Ascent TOR1?

The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.

Who operates Ascent TOR1?

Ascent.

Data centers near Grand River South

More Ascent data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.