Ascent TOR1
Ascent TOR1 is an operational data center operated by Ascent in Grand River South, Canada. Our footprint estimate of its power is about 46 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Ascent |
| Facility power | 46 MW (range 23 MW to 74 MW) Estimate from building footprint, low confidence. Footprint estimate: about 38,423 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 20,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Vondrau Drive 17, N3E 1A6 |
| Coordinates | 43.42750, -80.37199 |
| Website | ascentcorp.com/datacenters/toronto-data-center |
Power and grid
| Nearest high-voltage substation | Preston TS, 230 kV, 3.6 km away Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 6 |
| Power plants within 50 km | 651 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 7.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.5 °C (2001 to 2025) |
| Cooling degree days | 268 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.71 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Low - Medium (10-20%) (Ontario) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Ascent TOR1 use?
We estimate the facility power at about 46 MW. Estimate from building footprint, low confidence.
How close is Ascent TOR1 to the power grid?
The nearest high-voltage substation in OpenStreetMap is Preston TS (230 kV), about 3.6 km away.
How clean is the power for Ascent TOR1?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates Ascent TOR1?
Ascent.
Data centers near Grand River South
- Netflash Datacentre - Victoria St, Kitchener 7.9 km
- Rack and Data 8.2 km
- 30 Duke Street West Kitchener Ontario 9.8 km
- DataCity 440 Waterloo 14.9 km
- RBC Guelph Data Centre 15.3 km · 41 MW
- E-Solutions Data Fortress 15.4 km
- WITCo - Wat1 15.6 km
- Ministry of Government Services Data Centre 15.7 km · 39 MW
More Ascent data centers
- Ascent - Atlanta Data Center United States
- Ascent - CH2 United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.