Ascent - CH2
Ascent - CH2 is an operational data center operated by Ascent in Northlake, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Ascent |
| Networks | 2 networks PeeringDB. |
| Also known as | Digital Realty CHI (505 N Railroad) |
| Address | 505 N Railroad Ave |
| Coordinates | 41.92003, -87.91216 |
| Website | ascent-corp.com/DataCenters |
Power and grid
| Utility | Commonwealth Edison Co (investor owned) Electric retail service territory (HIFLD, US government). |
|---|---|
| Balancing authority | PJM |
| Nearest gas pipeline | Northern Illinois Gas Co, intrastate pipeline, 1.3 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Grid carbon intensity | 247 g CO₂ per kWh (Illinois, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 49.9%, gas 16.6%, coal 15.8%, wind 12.8%, solar 4.5%. Clean power: 67.3% |
| Industrial power price | USD 0.113 per kWh (Illinois, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 9.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 40.5 °C (2001 to 2025) |
| Cooling degree days | 465 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.67 kWh per m² per day |
| Wind at 50 m | 6.8 m/s average |
| Water stress today | Medium - High (20-40%) (Illinois) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for Ascent - CH2?
The grid in Illinois emits about 247 g CO₂ per kWh (2025). Largest sources: nuclear 49.9%, gas 16.6%, coal 15.8%.
Who operates Ascent - CH2?
Ascent.
Data centers near Northlake
- Microsoft - Azure Datacenter 601 m · 28 MW
- Aligned Data Center - Chicago ORD-01 803 m · 18 MW
- Aligned Chicago (ORD-01) 911 m
- Data center in Northlake 1.6 km · 6.4 MW
- Digital Realty CHI (9333 Grand Ave) 4.5 km
- Digital Realty CHI (9377 Grand Ave) 4.5 km · 26 MW
- TierPoint Chicago - West 4.5 km
- CDC4 - 1808 Swift Dr 7.4 km
More Ascent data centers
- Ascent TOR1 Canada
- Ascent - Atlanta Data Center United States
Sources
Correct this page or get the data