Ascent - CH2 is an operational data center operated by Ascent in Northlake, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorAscent
Networks2 networks
PeeringDB.
Also known asDigital Realty CHI (505 N Railroad)
Address505 N Railroad Ave
Coordinates41.92003, -87.91216
Websiteascent-corp.com/DataCenters

Power and grid

UtilityCommonwealth Edison Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineNorthern Illinois Gas Co, intrastate pipeline, 1.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Grid carbon intensity247 g CO₂ per kWh (Illinois, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 49.9%, gas 16.6%, coal 15.8%, wind 12.8%, solar 4.5%. Clean power: 67.3%
Industrial power priceUSD 0.113 per kWh (Illinois, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature9.5 °C
NASA POWER, average of 2001 to 2025.
Highest temperature40.5 °C (2001 to 2025)
Cooling degree days465 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.67 kWh per m² per day
Wind at 50 m6.8 m/s average
Water stress todayMedium - High (20-40%) (Illinois)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How clean is the power for Ascent - CH2?

The grid in Illinois emits about 247 g CO₂ per kWh (2025). Largest sources: nuclear 49.9%, gas 16.6%, coal 15.8%.

Who operates Ascent - CH2?

Ascent.

Data centers near Northlake

More Ascent data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.