Data Center Directory

AT&T data center in Kirksville

AT&T data center in Kirksville is an operational data center operated by AT&T in Kirksville, United States. Our footprint estimate of its power is about 0.8 MW.

Key facts

StatusOperational
OperatorAT&T
Facility power0.8 MW (range 0.4 MW to 1.3 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 654 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 340 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressEast Washington Street 216, 63501, Kirksville
Coordinates40.19448, -92.58123

Power and grid

Nearest high-voltage substationZachary Substation, 345 kV, 5 km away (Ameren)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km2
UtilityTri-County Electric Coop Assn (Mo)
Electric retail service territory (HIFLD, US government).
Balancing authorityAECI
Power plants within 50 km306 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity674 g CO₂ per kWh (Missouri, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 63.1%, gas 13%, nuclear 9.8%, wind 8.9%, solar 3.3%. Clean power: 23.7%
Industrial power priceUSD 0.099 per kWh (Missouri, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11.4 °C
NASA POWER, average of 2001 to 2025.
Highest temperature42.4 °C (2001 to 2025)
Cooling degree days661 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.09 kWh per m² per day
Wind at 50 m6.3 m/s average
Water stress todayLow - Medium (10-20%) (Missouri)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does AT&T data center in Kirksville use?

We estimate the facility power at about 0.8 MW. Estimate from building footprint, low confidence.

How close is AT&T data center in Kirksville to the power grid?

The nearest high-voltage substation in OpenStreetMap is Zachary Substation (345 kV), about 5 km away. The local utility is Tri-County Electric Coop Assn (Mo), in the AECI balancing area.

How clean is the power for AT&T data center in Kirksville?

The grid in Missouri emits about 674 g CO₂ per kWh (2025). Largest sources: coal 63.1%, gas 13%, nuclear 9.8%.

Who operates AT&T data center in Kirksville?

AT&T.

More AT&T data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.