Data Center Directory

AT&T Tuckerton Cable Landing Station (TAT-14)

AT&T Tuckerton Cable Landing Station (TAT-14) is an operational data center operated by AT&T in Tuckerton, United States. Our footprint estimate of its power is about 1.5 MW.

Key facts

StatusOperational
OperatorAT&T
Facility power1.5 MW (range 0.7 MW to 2.4 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 1,240 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 640 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
AddressCable Drive 17, 08087, Tuckerton
Coordinates39.61507, -74.32881

Power and grid

Nearest high-voltage substationCedar Substation, 230 kV, 10.1 km away (Atlantic City Electric)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
UtilityAtlantic City Electric Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Power plants within 50 km202 MW in 19 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity265 g CO₂ per kWh (New Jersey, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8%
Industrial power priceUSD 0.162 per kWh (New Jersey, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature13 °C
NASA POWER, average of 2001 to 2025.
Highest temperature33.2 °C (2001 to 2025)
Cooling degree days551 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.06 kWh per m² per day
Wind at 50 m7.1 m/s average
Water stress todayMedium - High (20-40%) (New Jersey)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does AT&T Tuckerton Cable Landing Station (TAT-14) use?

We estimate the facility power at about 1.5 MW. Estimate from building footprint, low confidence.

How close is AT&T Tuckerton Cable Landing Station (TAT-14) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Cedar Substation (230 kV), about 10.1 km away. The local utility is Atlantic City Electric Co, in the PJM balancing area.

How clean is the power for AT&T Tuckerton Cable Landing Station (TAT-14)?

The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.

Who operates AT&T Tuckerton Cable Landing Station (TAT-14)?

AT&T.

Data centers near Tuckerton

More AT&T data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.