Data Center Directory

Data center in Pine Lake Park

Data center in Pine Lake Park is an operational data center in Pine Lake Park, United States. Our footprint estimate of its power is about 115 MW.

Key facts

StatusOperational
Facility power115 MW (range 46 MW to 287 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 956,515 m² site outline x 0.12 kW per m² of land.
GPU capacity if all AIabout 49,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates40.04627, -74.27896

Power and grid

Nearest high-voltage substationUnnamed substation, 230 kV, 1.1 km away (Jersey Central Power and Light)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km3
UtilityJersey Central Power & Lt Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineTranscontinental Gas PL, interstate pipeline, 34.9 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km4.1 GW in 96 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity536 g CO₂ per kWh (Ohio, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20%
Industrial power priceUSD 0.098 per kWh (Ohio, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature12.3 °C
NASA POWER, average of 2001 to 2025.
Highest temperature36.5 °C (2001 to 2025)
Cooling degree days559 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.92 kWh per m² per day
Wind at 50 m6.2 m/s average
Water stress todayLow - Medium (10-20%) (Ohio)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Data center in Pine Lake Park use?

We estimate the facility power at about 115 MW. Estimate from building footprint, low confidence.

How close is Data center in Pine Lake Park to the power grid?

The nearest high-voltage substation in OpenStreetMap is an unnamed substation (230 kV), about 1.1 km away. The local utility is Jersey Central Power & Lt Co, in the PJM balancing area.

How clean is the power for Data center in Pine Lake Park?

The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.

Data centers near Pine Lake Park

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.