QTS Princeton (PJC1)

QTS Princeton (PJC1) is an operational data center operated by QTS Realty Trust in East Windsor, United States. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorQTS Realty Trust
Networks1 networks
PeeringDB.
AddressHeart of the Northeast, 159 Princeton-Hightstown Road
Coordinates40.27925, -74.54755
Websiteqtsdatacenters.com/data-centers/princeton

Power and grid

Nearest high-voltage substationWyckoff Substation, 115 kV, 2.5 km away (Jersey Central Power and Light)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationWindsor Substation, 230 kV, 3.7 km away
HV substations within 10 km7
UtilityJersey Central Power & Lt Co (investor owned)
Electric retail service territory (HIFLD, US government).
Balancing authorityPJM
Nearest gas pipelineTranscontinental Gas PL, interstate pipeline, 12.3 km away
US Energy Information Administration pipeline map. Straight-line distance.
Power plants within 50 km10 GW in 170 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity265 g CO₂ per kWh (New Jersey, 2025)
Average of all power made in the area. Ember.
Grid power mixgas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8%
Industrial power priceUSD 0.162 per kWh (New Jersey, August 2026)
Average price paid by industrial users in the state. EIA Electric Power Monthly.

Climate and water

Average temperature11.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature38.7 °C (2001 to 2025)
Cooling degree days565 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.92 kWh per m² per day
Wind at 50 m5.2 m/s average
Water stress todayMedium - High (20-40%) (New Jersey)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How close is QTS Princeton (PJC1) to the power grid?

The nearest high-voltage substation in OpenStreetMap is Wyckoff Substation (115 kV), about 2.5 km away. The local utility is Jersey Central Power & Lt Co, in the PJM balancing area.

How clean is the power for QTS Princeton (PJC1)?

The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.

Who operates QTS Princeton (PJC1)?

QTS Realty Trust.