Manasquan Cable Landing Station (TAT-14) is an operational data center operated by Sprint in Manasquan, United States. Our footprint estimate of its power is about 1.4 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Sprint |
| Facility power | 1.4 MW (range 0.7 MW to 2.3 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,190 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 600 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Sea Girt Avenue 600, 08736, Manasquan |
| Coordinates | 40.12956, -74.04277 |
Power and grid
| Nearest high-voltage substation | Oceanview Substation, 230 kV, 10.2 km away (Jersey Central Power and Light) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Utility | Jersey Central Power & Lt Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 39.9 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 3.3 GW in 65 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 265 g CO₂ per kWh (New Jersey, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8% |
| Industrial power price | USD 0.162 per kWh (New Jersey, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.9 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 31.7 °C (2001 to 2025) |
| Cooling degree days | 472 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.01 kWh per m² per day |
| Wind at 50 m | 7.5 m/s average |
| Water stress today | Medium - High (20-40%) (New Jersey) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Manasquan Cable Landing Station (TAT-14) use?
We estimate the facility power at about 1.4 MW. Estimate from building footprint, low confidence.
How close is Manasquan Cable Landing Station (TAT-14) to the power grid?
The nearest high-voltage substation in OpenStreetMap is Oceanview Substation (230 kV), about 10.2 km away. The local utility is Jersey Central Power & Lt Co, in the PJM balancing area.
How clean is the power for Manasquan Cable Landing Station (TAT-14)?
The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.
Who operates Manasquan Cable Landing Station (TAT-14)?
Sprint.
Data centers near Manasquan
- NJFX 3.6 km · 6 MW
- Manasquan Cable Landing Station (Apollo) 5.9 km · 3.1 MW
- Data center in Asbury Park 10.9 km · 10 MW
- Data center in Pine Lake Park 22.1 km · 115 MW
- Data center in Pine Lake Park 22.3 km · 53 MW
- Verizon Freehold Data Center 26.5 km · 15 MW
- QTS Princeton (PJC1) 46.0 km
- Iron Mountain Data Center - New Jersey (NJE-1) 50.6 km · 138 MW