Data center in Pine Lake Park
Data center in Pine Lake Park is an operational data center in Pine Lake Park, United States. Our footprint estimate of its power is about 53 MW.
Key facts
| Status | Operational |
|---|---|
| Facility power | 53 MW (range 21 MW to 133 MW) Estimate from building footprint, low confidence. Footprint estimate: about 444,043 m² site outline x 0.12 kW per m² of land. |
| GPU capacity if all AI | about 23,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Coordinates | 40.04271, -74.27931 |
Power and grid
| Nearest high-voltage substation | Manchester Substation, 230 kV, 700 m away (Jersey Central Power and Light) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 3 |
| Utility | Jersey Central Power & Lt Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Nearest gas pipeline | Transcontinental Gas PL, interstate pipeline, 35.1 km away US Energy Information Administration pipeline map. Straight-line distance. |
| Power plants within 50 km | 4.1 GW in 96 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 536 g CO₂ per kWh (Ohio, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 54.9%, coal 24.4%, nuclear 11.7%, solar 5.8%, wind 2%. Clean power: 20% |
| Industrial power price | USD 0.098 per kWh (Ohio, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 12.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.5 °C (2001 to 2025) |
| Cooling degree days | 559 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.92 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | Low - Medium (10-20%) (Ohio) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Data center in Pine Lake Park use?
We estimate the facility power at about 53 MW. Estimate from building footprint, low confidence.
How close is Data center in Pine Lake Park to the power grid?
The nearest high-voltage substation in OpenStreetMap is Manchester Substation (230 kV), about 700 m away. The local utility is Jersey Central Power & Lt Co, in the PJM balancing area.
How clean is the power for Data center in Pine Lake Park?
The grid in Ohio emits about 536 g CO₂ per kWh (2025). Largest sources: gas 54.9%, coal 24.4%, nuclear 11.7%.
Data centers near Pine Lake Park
- Data center in Pine Lake Park 398 m · 115 MW
- Manasquan Cable Landing Station (Apollo) 19.8 km · 3.1 MW
- Verizon Freehold Data Center 22.1 km · 15 MW
- Manasquan Cable Landing Station (TAT-14) 22.3 km · 1.4 MW
- Data center in Asbury Park 22.9 km · 10 MW
- NJFX 23.3 km · 6 MW
- QTS Princeton (PJC1) 34.8 km
- Princeton Della 44.1 km · 0.7 MW
Sources
Correct this page or get the data