GlobeNet Tuckerton Cable Landing Station
GlobeNet Tuckerton Cable Landing Station is an operational data center operated by GlobeNet in Tuckerton, United States. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | GlobeNet |
| Address | East Main Street 376, 08087, Tuckerton |
| Coordinates | 39.60987, -74.32614 |
Power and grid
| Nearest high-voltage substation | Cedar Substation, 230 kV, 10.5 km away (Atlantic City Electric) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Utility | Atlantic City Electric Co (investor owned) Electric retail service territory (HIFLD, US government). |
| Balancing authority | PJM |
| Power plants within 50 km | 187 MW in 17 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 265 g CO₂ per kWh (New Jersey, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 45.8%, nuclear 43.2%, solar 9%, oil and other fossil 1.5%, bioenergy 0.9%. Clean power: 52.8% |
| Industrial power price | USD 0.162 per kWh (New Jersey, August 2026) Average price paid by industrial users in the state. EIA Electric Power Monthly. |
Climate and water
| Average temperature | 13 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 33.2 °C (2001 to 2025) |
| Cooling degree days | 551 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.06 kWh per m² per day |
| Wind at 50 m | 7.1 m/s average |
| Water stress today | Medium - High (20-40%) (New Jersey) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is GlobeNet Tuckerton Cable Landing Station to the power grid?
The nearest high-voltage substation in OpenStreetMap is Cedar Substation (230 kV), about 10.5 km away. The local utility is Atlantic City Electric Co, in the PJM balancing area.
How clean is the power for GlobeNet Tuckerton Cable Landing Station?
The grid in New Jersey emits about 265 g CO₂ per kWh (2025). Largest sources: gas 45.8%, nuclear 43.2%, solar 9%.
Who operates GlobeNet Tuckerton Cable Landing Station?
GlobeNet.
Data centers near Tuckerton
- AT&T Tuckerton Cable Landing Station (TAT-14) 621 m · 1.5 MW
- Data center in Pine Lake Park 48.3 km · 53 MW
- Data center in Pine Lake Park 48.7 km · 115 MW
- Manasquan Cable Landing Station (TAT-14) 62.6 km · 1.4 MW
- Manasquan Cable Landing Station (Apollo) 63.8 km · 3.1 MW
- NJFX 65.5 km · 6 MW
- Data center in Asbury Park 68.9 km · 10 MW
- Verizon Freehold Data Center 70.0 km · 15 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.