AT TOKYO (CC1/CC2)
AT TOKYO (CC1/CC2) is an operational data center operated by AT TOKYO in Tokyo, Japan. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | AT TOKYO |
| Networks | 146 networks, 6 internet exchanges PeeringDB. |
| Coordinates | 35.64543, 139.79328 |
| Website | attokyo.co.jp |
Power and grid
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
|---|---|
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Average temperature | 15.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.7 °C (2001 to 2025) |
| Cooling degree days | 872 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.77 kWh per m² per day |
| Wind at 50 m | 5.9 m/s average |
| Water stress today | Medium - High (20-40%) (Tokyo) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How clean is the power for AT TOKYO (CC1/CC2)?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Who operates AT TOKYO (CC1/CC2)?
AT TOKYO.
Data centers near Tokyo
- @Tokyo Chuo Center (CC1 & CC2) 348 m · 12 MW
- Equinix TY11 - Tokyo 639 m · 38 MW
- 株式会社アット東京 data center in Toyosu 881 m
- Equinix TY3 - Tokyo 1.6 km · 19 MW
- Colt Shiohama 2.7 km
- "Center for Advanced Intelligence Project, RIKEN, RAIDEN" 2.8 km · 0.2 MW
- SoftBank 3.1 km
- NTT DOCOMO BUSINESS TK3 - Tokyo 3.4 km
More AT TOKYO data centers
- AT TOKYO (CC3) Japan
Sources
Correct this page or get the data