Equinix TY11 - Tokyo is an operational data center operated by Equinix in Tokyo, Japan. Our footprint estimate of its power is about 38 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Equinix |
| Facility power | 38 MW (range 19 MW to 60 MW) Estimate from building footprint, low confidence. Footprint estimate: about 6,272 m² building outline x 5 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 16,000 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Networks | 8 networks, 2 internet exchanges PeeringDB. |
| Also known as | Equinix Tokyo TY11 |
| Address | 1-2-41 Ariake, Koto-ku |
| Coordinates | 35.63974, 139.79236 |
| Website | equinix.com/locations/asia-colocation/japan-colocation/tokyo-data-centers/ty11 |
Power and grid
| Nearest high-voltage substation | 新豊洲変電所, 500 kV, 900 m away (東京電力パワーグリッド) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 15 |
| Power plants within 50 km | 37 GW in 42 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 474 g CO₂ per kWh (Japan, 2025) Average of all power made in the area. Ember. |
| Grid power mix | gas 32.7%, coal 31.8%, solar 10.8%, nuclear 9.2%, hydro 7.2%. Clean power: 33% |
Climate and water
| Average temperature | 15.6 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.7 °C (2001 to 2025) |
| Cooling degree days | 872 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.77 kWh per m² per day |
| Wind at 50 m | 5.9 m/s average |
| Water stress today | Medium - High (20-40%) (Tokyo) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Equinix TY11 - Tokyo use?
We estimate the facility power at about 38 MW. Estimate from building footprint, low confidence.
How close is Equinix TY11 - Tokyo to the power grid?
The nearest high-voltage substation in OpenStreetMap is 新豊洲変電所 (500 kV), about 900 m away.
How clean is the power for Equinix TY11 - Tokyo?
The grid in Japan emits about 474 g CO₂ per kWh (2025). Largest sources: gas 32.7%, coal 31.8%, solar 10.8%.
Who operates Equinix TY11 - Tokyo?
Equinix.
Data centers near Tokyo
- AT TOKYO (CC1/CC2) 639 m
- @Tokyo Chuo Center (CC1 & CC2) 978 m · 12 MW
- 株式会社アット東京 data center in Toyosu 1.5 km
- Equinix TY3 - Tokyo 2.1 km · 19 MW
- Colt Shiohama 3.2 km
- SoftBank 3.3 km
- "Center for Advanced Intelligence Project, RIKEN, RAIDEN" 3.4 km · 0.2 MW
- NTT DOCOMO BUSINESS TK3 - Tokyo 4.0 km
More Equinix data centers
- Equinix DA1 - Dallas United States
- Equinix SP6 Brazil
- Equinix PH1 - Philadelphia United States
- Equinix PA13X France
- Equinix CH1/CH2/CH4 - Chicago United States
- Equinix CH3 - Elk Grove United States
- Equinix AM3 - Amsterdam, Science Park Netherlands
- Equinix LA1 - Los Angeles United States
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.