AtlanticTechnology Centre
AtlanticTechnology Centre is an operational data center operated by Atlantic Technology Centre in Charlottetown, Canada. No power figure is public for this site yet.
Key facts
| Status | Operational |
|---|---|
| Operator | Atlantic Technology Centre |
| Networks | 1 networks PeeringDB. |
| Address | 176 Great George St |
| Coordinates | 46.23706, -63.12808 |
| Website | atlantictechnologycentre.ca |
Power and grid
| Nearest high-voltage substation | West Royalty Substation, 138 kV, 5.2 km away (Maritime Electric) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 1 |
| Power plants within 50 km | 90 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 6.5 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 30 °C (2001 to 2025) |
| Cooling degree days | 97 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.31 kWh per m² per day |
| Wind at 50 m | 6.5 m/s average |
| Water stress today | Low (<10%) (Prince Edward Island) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How close is AtlanticTechnology Centre to the power grid?
The nearest high-voltage substation in OpenStreetMap is West Royalty Substation (138 kV), about 5.2 km away.
How clean is the power for AtlanticTechnology Centre?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates AtlanticTechnology Centre?
Atlantic Technology Centre.
Data centers near Charlottetown
- Bell Aliant PEI 2.0 km · 1.8 MW
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.