Bell Aliant PEI
Bell Aliant PEI is an operational data center operated by Bell Canada in Charlottetown, Canada. Our footprint estimate of its power is about 1.8 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Bell Canada |
| Facility power | 1.8 MW (range 0.9 MW to 2.9 MW) Estimate from building footprint, low confidence. Footprint estimate: about 1,530 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 770 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Belvedere Avenue 69, Charlottetown |
| Coordinates | 46.25102, -63.14369 |
Power and grid
| Nearest high-voltage substation | West Royalty Substation, 138 kV, 3.2 km away (Maritime Electric) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| HV substations within 10 km | 1 |
| Power plants within 50 km | 90 MW in 2 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 6.3 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 27.4 °C (2001 to 2025) |
| Cooling degree days | 79 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.31 kWh per m² per day |
| Wind at 50 m | 8.3 m/s average |
| Water stress today | Low (<10%) (Prince Edward Island) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Low (<10%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Bell Aliant PEI use?
We estimate the facility power at about 1.8 MW. Estimate from building footprint, low confidence.
How close is Bell Aliant PEI to the power grid?
The nearest high-voltage substation in OpenStreetMap is West Royalty Substation (138 kV), about 3.2 km away.
How clean is the power for Bell Aliant PEI?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates Bell Aliant PEI?
Bell Canada.
Data centers near Charlottetown
- AtlanticTechnology Centre 2.0 km
More Bell Canada data centers
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.