Bell Canada data center in Rosemont–La Petite-Patrie
Bell Canada data center in Rosemont–La Petite-Patrie is an operational data center operated by Bell Canada in Rosemont–La Petite-Patrie, Canada. Our footprint estimate of its power is about 3.2 MW.
Key facts
| Status | Operational |
|---|---|
| Operator | Bell Canada |
| Facility power | 3.2 MW (range 1.6 MW to 5.1 MW) Estimate from building footprint, low confidence. Footprint estimate: about 2,654 m² building outline x 1 floor(s) x 1.2 kW/m². |
| GPU capacity if all AI | about 1,400 GPUs If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count. |
| Address | Rue Saint-Dominique 6420 |
| Coordinates | 45.53019, -73.60684 |
Power and grid
| Nearest high-voltage substation | Poste Beaumont, 120 kV, 1.2 km away (Hydro-Québec) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Poste de Rosemont, 315 kV, 2.3 km away |
| HV substations within 10 km | 28 |
| Power plants within 50 km | 2.1 GW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 192 g CO₂ per kWh (Canada, 2025) Average of all power made in the area. Ember. |
| Grid power mix | hydro 52.8%, gas 19.7%, nuclear 12.8%, wind 8%, coal 2.7%. Clean power: 76.5% |
Climate and water
| Average temperature | 6.4 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 36.6 °C (2001 to 2025) |
| Cooling degree days | 272 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 3.54 kWh per m² per day |
| Wind at 50 m | 6.2 m/s average |
| Water stress today | Low - Medium (10-20%) (Canada) Share of the local water supply that people already use. WRI Aqueduct 4.0, country level. |
| Water stress in 2050 | Low - Medium (10-20%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
How much power does Bell Canada data center in Rosemont–La Petite-Patrie use?
We estimate the facility power at about 3.2 MW. Estimate from building footprint, low confidence.
How close is Bell Canada data center in Rosemont–La Petite-Patrie to the power grid?
The nearest high-voltage substation in OpenStreetMap is Poste Beaumont (120 kV), about 1.2 km away.
How clean is the power for Bell Canada data center in Rosemont–La Petite-Patrie?
The grid in Canada emits about 192 g CO₂ per kWh (2025). Largest sources: hydro 52.8%, gas 19.7%, nuclear 12.8%.
Who operates Bell Canada data center in Rosemont–La Petite-Patrie?
Bell Canada.
Data centers near Rosemont–La Petite-Patrie
- Vidéotron data center in Rosemont–La Petite-Patrie 344 m · 3.8 MW
- Enovum Datacenters MTL01 3.3 km
- Smartdc Montreal 3.5 km
- Openface DC2 3.6 km
- Cologix MTL7 4.3 km
- Aptum MTL1 4.5 km
- Cologix MTL3 4.6 km
- eStruxture MTL-1 4.7 km
More Bell Canada data centers
- Bell Aliant PEI Canada
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.