Key facts

StatusOperational
OperatorBahnhof
Facility power0.6 MW (range 0.3 MW to 1 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 507 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 260 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Coordinates59.40986, 17.95297

Power and grid

Nearest high-voltage substationJärva, 220 kV, 3.9 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
HV substations within 10 km7
Grid carbon intensity36 g CO₂ per kWh (Sweden, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 40%, nuclear 27.4%, wind 22.8%, bioenergy 5.9%, solar 2.6%. Clean power: 98.7%
Industrial power priceEUR 0.096 per kWh (Sweden, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature6.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature31.8 °C (2001 to 2025)
Cooling degree days59 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.79 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayMedium - High (20-40%) (Stockholm)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Bahnhof data center in Sollentuna use?

We estimate the facility power at about 0.6 MW. Estimate from building footprint, low confidence.

How close is Bahnhof data center in Sollentuna to the power grid?

The nearest high-voltage substation in OpenStreetMap is Järva (220 kV), about 3.9 km away.

How clean is the power for Bahnhof data center in Sollentuna?

The grid in Sweden emits about 36 g CO₂ per kWh (2025). Largest sources: hydro 40%, nuclear 27.4%, wind 22.8%.

Who operates Bahnhof data center in Sollentuna?

Bahnhof.

Data centers near Sollentuna

More Bahnhof data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.