Data Center Directory

Digital Realty Stockholm STO1-6

Digital Realty Stockholm STO1-6 is an operational data center operated by Digital Realty in Stockholm, Sweden. Our footprint estimate of its power is about 54 MW.

Key facts

StatusOperational
OperatorDigital Realty
Facility power54 MW (range 27 MW to 87 MW)
Estimate from building footprint, low confidence. Footprint estimate: about 45,300 m² building outline x 1 floor(s) x 1.2 kW/m².
GPU capacity if all AIabout 23,000 GPUs
If all IT power ran GB200-class GPUs at 1.8 kW each, all-in (PUE 1.3). An upper bound, not a count.
Networks131 networks, 13 internet exchanges
PeeringDB.
Also known asDigital Realty Stockholm STO1-STO5
AddressEsbogatan 11, Kista
Coordinates59.42223, 17.91670
Websiteinterxion.com

Power and grid

Nearest high-voltage substationHäggvik, 132 kV, 2.9 km away
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationJärva, 220 kV, 6.2 km away
HV substations within 10 km7
Power plants within 50 km4 MW in 1 plant
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity36 g CO₂ per kWh (Sweden, 2025)
Average of all power made in the area. Ember.
Grid power mixhydro 40%, nuclear 27.4%, wind 22.8%, bioenergy 5.9%, solar 2.6%. Clean power: 98.7%
Industrial power priceEUR 0.096 per kWh (Sweden, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature6.9 °C
NASA POWER, average of 2001 to 2025.
Highest temperature31.8 °C (2001 to 2025)
Cooling degree days59 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy2.79 kWh per m² per day
Wind at 50 m4.6 m/s average
Water stress todayMedium - High (20-40%) (Stockholm)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

How much power does Digital Realty Stockholm STO1-6 use?

We estimate the facility power at about 54 MW. Estimate from building footprint, low confidence.

How close is Digital Realty Stockholm STO1-6 to the power grid?

The nearest high-voltage substation in OpenStreetMap is Häggvik (132 kV), about 2.9 km away.

How clean is the power for Digital Realty Stockholm STO1-6?

The grid in Sweden emits about 36 g CO₂ per kWh (2025). Largest sources: hydro 40%, nuclear 27.4%, wind 22.8%.

Who operates Digital Realty Stockholm STO1-6?

Digital Realty.

Data centers near Stockholm

More Digital Realty data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.