Bestgo.pl is an operational data center operated by Bestgo.pl in Wroclaw, Poland. No power figure is public for this site yet.

Key facts

StatusOperational
OperatorBestgo.pl
AddressGłówna 94/11
Coordinates51.16155, 16.90151
Websitebestgo.pl

Power and grid

Nearest high-voltage substationStacja elektroenergetyczna 110/20kV „GPZ Leśnica”, 110 kV, 1.9 km away (Tauron)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Nearest 220 kV+ substationStacja elektroenergetyczna 400/110kV „SE Pasikurowice”, 400 kV, 16.2 km away
HV substations within 10 km9
Power plants within 50 km456 MW in 7 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity591 g CO₂ per kWh (Poland, 2025)
Average of all power made in the area. Ember.
Grid power mixcoal 50.6%, gas 14.4%, wind 13.9%, solar 11.3%, bioenergy 4.9%. Clean power: 31.2%
Industrial power priceEUR 0.169 per kWh (Poland, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature9.1 °C
NASA POWER, average of 2001 to 2025.
Highest temperature37.8 °C (2001 to 2025)
Cooling degree days200 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy3.02 kWh per m² per day
Wind at 50 m6.3 m/s average
Water stress todayLow - Medium (10-20%) (Poland)
Share of the local water supply that people already use. WRI Aqueduct 4.0, country level.
Water stress in 2050Low - Medium (10-20%)
Business-as-usual scenario.

Satellite view

Questions

How close is Bestgo.pl to the power grid?

The nearest high-voltage substation in OpenStreetMap is Stacja elektroenergetyczna 110/20kV „GPZ Leśnica” (110 kV), about 1.9 km away.

How clean is the power for Bestgo.pl?

The grid in Poland emits about 591 g CO₂ per kWh (2025). Largest sources: coal 50.6%, gas 14.4%, wind 13.9%.

Who operates Bestgo.pl?

Bestgo.pl.

Data centers near Wroclaw

Sources

Correct this page or get the data