BGDS TELEKOM EOOD.

BGDS TELEKOM EOOD. is an operational data center operated by BGDS TELEKOM EOOD. in Kapitan Andreevo, Bulgaria. No power figure is public for this site yet. Likely chips: Huawei Ascend and NVIDIA China-market GPUs (guess).

Key facts

StatusOperational
OperatorBGDS TELEKOM EOOD.
AI chipsHuawei Ascend and NVIDIA China-market GPUs
Guess from the operator, not confirmed. Chinese operators use Huawei Ascend and export-limited NVIDIA chips.
AddressBuzludzha no 8
Coordinates41.72111, 26.32349
Websitebgds.bg

Power and grid

Nearest high-voltage substationПС Свиленград, 110 kV, 11.8 km away (Електроенергиен системен оператор)
Straight-line distance. OpenStreetMap, substations of 100 kV and more.
Power plants within 50 km126 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed.
Grid carbon intensity275 g CO₂ per kWh (Bulgaria, 2025)
Average of all power made in the area. Ember.
Grid power mixnuclear 39%, coal 22.5%, solar 18.2%, hydro 6.7%, gas 4.9%. Clean power: 71.9%
Industrial power priceEUR 0.136 per kWh (Bulgaria, 2026-S1)
Non-household users with 20 to 70 GWh per year, without VAT. Eurostat.

Climate and water

Average temperature13.7 °C
NASA POWER, average of 2001 to 2025.
Highest temperature44.8 °C (2001 to 2025)
Cooling degree days746 per year (base 18.3 °C)
More cooling degree days means more energy for cooling.
Solar energy4.2 kWh per m² per day
Wind at 50 m5.7 m/s average
Water stress todayMedium - High (20-40%) (Haskovo)
Share of the local water supply that people already use. WRI Aqueduct 4.0, province level.
Water stress in 2050Medium - High (20-40%)
Business-as-usual scenario.

Satellite view

Questions

What chips does BGDS TELEKOM EOOD. use?

No chips are reported. Based on the operator, the likely chips are Huawei Ascend and NVIDIA China-market GPUs.

How close is BGDS TELEKOM EOOD. to the power grid?

The nearest high-voltage substation in OpenStreetMap is ПС Свиленград (110 kV), about 11.8 km away.

How clean is the power for BGDS TELEKOM EOOD.?

The grid in Bulgaria emits about 275 g CO₂ per kWh (2025). Largest sources: nuclear 39%, coal 22.5%, solar 18.2%.

Who operates BGDS TELEKOM EOOD.?

BGDS TELEKOM EOOD..

Data centers near Kapitan Andreevo

More BGDS TELEKOM EOOD. data centers

Sources

Correct this page or get the data

Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.