BGDS TELEKOM EOOD.
BGDS TELEKOM EOOD. is an operational data center operated by BGDS TELEKOM EOOD. in Kapitan Andreevo, Bulgaria. No power figure is public for this site yet. Likely chips: Huawei Ascend and NVIDIA China-market GPUs (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | BGDS TELEKOM EOOD. |
| AI chips | Huawei Ascend and NVIDIA China-market GPUs Guess from the operator, not confirmed. Chinese operators use Huawei Ascend and export-limited NVIDIA chips. |
| Address | Buzludzha no 8 |
| Coordinates | 41.72111, 26.32349 |
| Website | bgds.bg |
Power and grid
| Nearest high-voltage substation | ПС Свиленград, 110 kV, 11.8 km away (Електроенергиен системен оператор) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Power plants within 50 km | 126 MW in 3 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 275 g CO₂ per kWh (Bulgaria, 2025) Average of all power made in the area. Ember. |
| Grid power mix | nuclear 39%, coal 22.5%, solar 18.2%, hydro 6.7%, gas 4.9%. Clean power: 71.9% |
| Industrial power price | EUR 0.136 per kWh (Bulgaria, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 13.7 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 44.8 °C (2001 to 2025) |
| Cooling degree days | 746 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.2 kWh per m² per day |
| Wind at 50 m | 5.7 m/s average |
| Water stress today | Medium - High (20-40%) (Haskovo) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Medium - High (20-40%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
What chips does BGDS TELEKOM EOOD. use?
No chips are reported. Based on the operator, the likely chips are Huawei Ascend and NVIDIA China-market GPUs.
How close is BGDS TELEKOM EOOD. to the power grid?
The nearest high-voltage substation in OpenStreetMap is ПС Свиленград (110 kV), about 11.8 km away.
How clean is the power for BGDS TELEKOM EOOD.?
The grid in Bulgaria emits about 275 g CO₂ per kWh (2025). Largest sources: nuclear 39%, coal 22.5%, solar 18.2%.
Who operates BGDS TELEKOM EOOD.?
BGDS TELEKOM EOOD..
Data centers near Kapitan Andreevo
- Turkcell Edirne Veri Merkezi 22.1 km
- Haskovo Colo 69.0 km
More BGDS TELEKOM EOOD. data centers
- ISTANBULDC VERI MERKEZI Türkiye
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.