ISTANBULDC VERI MERKEZI
ISTANBULDC VERI MERKEZI is an operational data center operated by BGDS TELEKOM EOOD. in Istanbul, Türkiye. No power figure is public for this site yet. Likely chips: Huawei Ascend and NVIDIA China-market GPUs (guess).
Key facts
| Status | Operational |
|---|---|
| Operator | BGDS TELEKOM EOOD. |
| AI chips | Huawei Ascend and NVIDIA China-market GPUs Guess from the operator, not confirmed. Chinese operators use Huawei Ascend and export-limited NVIDIA chips. |
| Networks | 1 networks PeeringDB. |
| Also known as | Mitues Istanbul |
| Address | Buyukdere Cad. No:171 Metrocity AVM, Kat -4 |
| Coordinates | 41.07588, 29.01224 |
| Website | istanbuldc.com |
Power and grid
| Nearest high-voltage substation | Etiler TM, 154 kV, 1.3 km away (TEİAŞ) Straight-line distance. OpenStreetMap, substations of 100 kV and more. |
|---|---|
| Nearest 220 kV+ substation | Çağlayan Muharrem Karadağ GİS Trafo Merkezi, 400 kV, 2.6 km away |
| HV substations within 10 km | 21 |
| Power plants within 50 km | 2.3 GW in 4 plants
Plants with a stated output in OpenStreetMap. The largest four are listed. |
| Grid carbon intensity | 476 g CO₂ per kWh (Türkiye, 2025) Average of all power made in the area. Ember. |
| Grid power mix | coal 34.3%, gas 22.1%, hydro 16.2%, wind 11.1%, solar 10.5%. Clean power: 43.3% |
| Industrial power price | EUR 0.054 per kWh (Türkiye, 2026-S1) Non-household users with 20 to 70 GWh per year, without VAT. Eurostat. |
Climate and water
| Average temperature | 15.2 °C NASA POWER, average of 2001 to 2025. |
|---|---|
| Highest temperature | 38.1 °C (2001 to 2025) |
| Cooling degree days | 730 per year (base 18.3 °C) More cooling degree days means more energy for cooling. |
| Solar energy | 4.05 kWh per m² per day |
| Wind at 50 m | 6.3 m/s average |
| Water stress today | High (40-80%) (Istanbul) Share of the local water supply that people already use. WRI Aqueduct 4.0, province level. |
| Water stress in 2050 | Extremely High (>80%) Business-as-usual scenario. |
Satellite view
Google satellite · Copernicus Sentinel-2 history · OpenStreetMap
Questions
What chips does ISTANBULDC VERI MERKEZI use?
No chips are reported. Based on the operator, the likely chips are Huawei Ascend and NVIDIA China-market GPUs.
How close is ISTANBULDC VERI MERKEZI to the power grid?
The nearest high-voltage substation in OpenStreetMap is Etiler TM (154 kV), about 1.3 km away.
How clean is the power for ISTANBULDC VERI MERKEZI?
The grid in Türkiye emits about 476 g CO₂ per kWh (2025). Largest sources: coal 34.3%, gas 22.1%, hydro 16.2%.
Who operates ISTANBULDC VERI MERKEZI?
BGDS TELEKOM EOOD..
Data centers near Istanbul
- Radore Istanbul 154 m
- IBM Istanbul 547 m
- intibu - istanbul 590 m
- Netbone Datacenter İstanbul 1.0 km
- TurkNet Iletisim Hizmetleri A.S 1.1 km
- Turk Telekom Gayrettepe IDC 1.6 km
- Mars Datacenter 3.2 km · 4.9 MW
- NetFactor 6.6 km
More BGDS TELEKOM EOOD. data centers
- BGDS TELEKOM EOOD. Bulgaria
Sources
Correct this page or get the data
Do you know this site? Send a correction, a power figure or a chip count. Do you need the full dataset, power demand by region, or a list of sites that need power? Leave your email.